Input Commands
PROJECT- MIDLAND TRANSPORT
STRUCTURE- FLOOR SLAB ON PILES
$
USE CODE NBC-95 LSD, CONCRETE 4357
DESIGN TWO WAY SYSTEM
USE SLAB 10.5, FLL 300, SPANS 24, WEB 16 48
USE SLAB COVER BOT 2, TOP 2.5
USE FL PROJECTION 24
B101 22-10 B102 B103 21-6 B104 7-2 B105 DUMMY
B106 7-2 B107 21-6 B108 TO 110 B111 22-10
B201 TO 202 FL NS 7-6 FS 8-6
S301 22-10 S302 S303 30 d 14 S304 TO 305 S306 30 d 14
S307 TO 309 S310 22-10
S401 22-10 S402 S403 32 d 14 S404 TO 405
S406 32-0 d 14 S407 TO 409 S410 22-10
B501 22-10 B502 B503 TO 504 FL NS 11.42 12 B505 TO 506
B507 TO 508 12 FL NS 11.42 B509 TO 511 B512 22-10
USE SPAN 22-10
B601 TO 603 B602 24 S701 TO 803 S702 24
B901 5-0 104R 10-0 201 30-0 S902 24 S903 WIDTH 28-0
S1001 16 S1002 24 S1003
B1101 5-0 106 10-0 202R 30 S1102 24 S1103 WIDTH 28-0
S1201 TO 1503 S1202 24 B1601 TO 1603 B1602 24
$
ANALYSE COLS SQ 12 L 20
SUPPRESS DESIGN COLS LEVEL 1
USE DROPS 8-0 8-0 14.5
USE IMF .001
C1 TO 4 101 601 701 801 0 C6 TO 11 107 0 1201
C5 202 1001 C12 TO 22 301 602
C23 TO 33 401 603 C34 TO 36 501 604
C37 TO 40 504 0 904 1004 1104 C41 TO 46 508 0 1204
C47 105 O C48 106 O
C1 TO 46 CAP PROJ 16
C13 TO 14 RECT 12 52 C18 TO 21 RECT 12 52
C24 TO 33 RECT 12 52
C15 RECT 52 12 C17 RECT 52 12
STRUCTURAL SLAB PLAN
 |
|